Hollowell Mitigation Bank

Location

North Carolina

Watershed

HUC 03020201/Neuse 01

Pre-Construction

Hollowell is a mitigation bank located in the Inner Coastal Plain Physiographic Province within the Neuse 01 Watershed (HUC 03020201). The project provides stream and wetland mitigation credits to compensate for unavoidable impacts to waters of the United States authorized under Sections 401 and 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act. Additionally, the bank provides nutrient and buffer credits in accordance with the state’s Nutrient Offset and Consolidated Buffer Mitigation Rule.

The project provides floodplain connection to incised stream reaches by lowering stream bank height, increased native riparian buffer and wetland species density and richness within stream floodplains, improved stream bedform diversity, and results in the aquatic species diversity and abundance through the addition of in-stream cover and woody debris.

During Construction 1

During Construction

Primary Service Area:
Neuse 01

State:
NC

Easement Acres:
72

Linear Feet of Stream:
8,979

Acres of Wetland Restoration:
11

Project Goals

Promotion of agronomic farm management techniques and implementation of agricultural best management practices through nutrient management and wetland restoration.

  • Targeted restoration of degraded streams and riparian buffers.
  • Sediment, turbidity, and nutrient reduction to the Neuse Watershed.
  • Restoration, enhancement, and preservation of headwater streams, wetlands, and riparian buffers.
Hollowell UT2 After 1

Contact Us For More Info

  • This field is for validation purposes and should be left unchanged.